Lake Erie N-scale Society

Photos and Video

pages 987654321
(latest photos are on highest numbered pages)

June 2013
NTrak Reverse Loop Module work session #1
Laying roadbed on the new reverse loop modules
NTRAK Reverse Loop Module
Cork roadbed is down...
NTRAK Reverse Loop Module
Roadbed painted and outer loop of track nailed down
NTRAK Reverse Loop Module
Underside showing nails ground off and controller mounted
Session #2
Laying remaining track, mounting switch motors, and ballasting
NTRAK Reverse Loop Module
Laying Inter loop tack
NTRAK Reverse Loop Module
Mounting and aligning the switch motors underneath module
NTRAK Reverse Loop Module
Ballasting track
NTRAK Reverse Loop Module
Cutting the gaps and inserting the insulators
Session #3, July 2013
Placing Buildings and painting roads & sidewalks on "City" module.
NTRAK Reverse Loop Module
NTRAK Reverse Loop Module

Perry Library setup
Our first setup using the new reverse loop modules at Perry Library, Aug 15th-17th 2013


NTRAK Reverse Loop Module NTRAK Reverse Loop Module NTRAK Reverse Loop Module